Gen AlphaLooks & Status
Aura farming
Deliberately doing things to look cool.
What it actually means
Performing coolness on purpose — the slow turn, the sunglasses, the dramatic walk. Calling it out means the effort was visible, which defeats it.
In the wild
he keeps posing at the mirror, pure aura farming
He's obviously trying to look impressive.
Knew that one. How about nine more?
Take the two-minute test and find out where the real gaps are.